Basic Info.
Air Tube Material
Galvanized Sheet
Corrosion Durability
Higher
Operating Voltage
230 VAC
Application Fields
Hotel,Home,Industrial,Comercial,Villia
Certification
ISO, CE, SGS
Product Description
The cooling capacity of the ceiling type air conditioning unit ranges from 14800Kca/h to 155000Kca/h in 10 specifications with 8 functional segments for users to choose freely. It is mainly used for air purification system of various clean plants. Such as all kinds of hotels, shopping malls, airports, hospitals, factories, scientific research institutions and other comfortable places. In terms of installation, there are three types of air cooling air type, air cooling heat pump type and air cooling all fresh air type. Compact structure, small volume, suitable for ceiling hoisting, reduce the installation space.
There are many ways of air return and all fresh air introduction, which can effectively improve air quality.
With independent cooling bridge and sealing measures.
Multiple security protection is provided.
Is the central air conditioning terminal system hoisting air treatment unit. It can filter, cool down, dehumidify, heat, and introduce fresh air. It is suitable for sending the treated air through the air duct to a certain distance. It is especially suitable for small commercial and industrial building air conditioning projects. This series has a total of 39 specifications of 13 models, with air volume ranging from 1500 to 15000m3/h and cooling capacity from 7.8kw to 277.3 kw.
Unit appearance is milky white, with nylon filter. The heat exchanger USES copper tube string high efficiency aluminum fin, after the mechanical expansion tube, the heat transfer effect is remarkable. 1. The suspended ceiling type air conditioning unit shall be installed horizontally in the sandwich layer of the suspended ceiling. The side of condensed water pipe shall be allowed to be lower than 5/1000, but not higher, so as to ensure the smooth discharge of condensed water. The unit should be fully installed around the maintenance space.
2. The condensate discharge connected with the unit shall be provided with a water seal with sufficient height.
3. The connection pipe of the table cooler is bottom in and top out, and the stop valve and filter should be installed at the water inlet.
4. The air duct connected to the fish unit shall be flexibly linked, and the water pipe connected to the unit shall use a winding pipe, and the torque should not be too large when the pipe is connected, so as to avoid loss of heat exchanger. And the pipeline must have a separate support, large weight by the electrical unit to bear.
5. The power supply of the unit is 380V and 50Hz. Only when the power supply meets the requirements can it be connected with the motor. After the power supply is connected, check whether the fan's direction is correct. If it is reversed, stop the machine and change the phase sequence of the power supply.
6. The fan motor should have good grounding, and be provided with other reliable protection such as overload, overheating and missing items. 1. The cold and hot medium of the unit shall be pure softened water, and its working pressure shall not exceed 1.6Mpa.
2. The temperature rise of fan bearing should not exceed 40ºC during normal operation of the unit.
3. The outlet pipe of the unit is equipped with an exhaust valve, which shall be opened before the first operation and the cold and heat conversion to drain the air in the heat exchanger and pipeline, so as not to affect the heat transfer effect. The total cold water temperature of the unit in summer shall not be lower than 5ºC, and the heating temperature in winter shall not be higher than 80ºC.
4. In winter, when all fresh air units of severe cold regions start heating, the heater should be opened for 5-10 minutes before starting the blower to prevent a large amount of cold air from forming ice plugs in the heat exchanger; Stop should first close the fresh air valve, after closing the heater, it is best to close the blower.
5. When the unit is not in use for a long time in winter, it shall empty the water in the coil tube and blow dry with compressed air. If the water cannot be blown clean, it shall add antifreeze in the tube. If the unit does not run temporarily during the winter period, hot water circulation should be ensured in the pipe to prevent rust and freeze. In addition to winter, when the heat exchanger is out of use in other seasons, the heat exchanger should also be filled with water to reduce erosion.
6. The filter should be cleaned regularly to ensure the operation effect of the unit. If the air volume is reduced, it is usually caused by excessive dust accumulation of the filter.
7. After the unit runs for one month, check whether the lifting fastening bolts are loose.
After the unit runs for two to three years, it should be fully maintained, clear the scale in the heat exchanger tube, and clean the heat exchanger fins with compressed air or water. Fan. Motor lubrication parts should be regularly filled with lubricating oil.
After two to three years of operation, the heat exchanger fins should be cleaned with compressed air or water. Fan. Motor lubrication parts should be regularly filled with lubricating oil.Product features:1.Compact structure, small volume, suitable for ceiling hoisting, reduce the installation space.
2.There are many ways of air return and all fresh air introduction, which can effectively improve air quality.
3.With independent cooling bridge and sealing measures.
4.Multiple security protection is provided.
5.Microcomputer control, fault self-diagnosis function, cable control and remote control for choice, flexible installation, convenient maintenanceCONTACT US
Tel: + 86-0534-8150650
Mobile: + 86-15969647730
Sincerely welcome customers to visit our factory!
Address:
Block a, Wanda Plaza, Dezhou, Shandong, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Industrial Equipment & Components
Company Introduction:
Our company is specialized in different kinds of products. We stick to the principle of quality first, service first, continuous improvement and innovation to meet the customers for the management and zero defect, zero complaints as the quality objective. To perfect our service, we make our products with good quality at the reasonable price.